The first of two dormitory sections of the LNG Canada camp at Kitimat is now being assembled. (Photo courtesy LNG Canada) One of the more visible above-ground projects now underway is that of the worker camp, Cedar Valley Lodge. (Contributed photo)

LNG Kitimat work camp takes shape

Extensive worker camp now being assembled

Born in Ireland but having spent years overseeing liquefied natural gas (LNG) construction projects in Australia, LNG Canada’s just-arrived general manager for its $40 billion facility in Kitimat is firm about his expectations.

“We want this to be the safest project on earth,” Vince Kenny says of construction which has just passed the one year mark leading to a planned finish in 2024.

With just under 1,000 people now working at the 400-hectare site, now is the time to cement that standard, he says.

“By the time we get to 5,000 people, we will have that culture in place,” Kenny said, emphasizing this project will be his seventh. “Unless we’ve got a culture, all the systems, processes and procedures are ineffective.”

Employees begin each shift reviewing the work plan, a procedure called a toolbox discussion.

“We’re here to take care of one another,” says Kenny, translating the IIF acronym that’s the hallmark of LNG Canada — Incident and Injury Free.

Even a brief tour of the works by a group of journalists from across B.C. starts with a video of LNG Canada workers outlining safety and security, the two words being almost interchangeable.

Workers have ID cards to be ‘badged in,’ creating an electronic record of their presence. They’re required to stay within their designated work area.

There are constant security patrols. Vehicles are inspected for any fluid leaks before entry.

There’s specific mention of drug-sniffing dogs too.

READ MORE: Okanagan company wins contract for LNG Canada project in Kitimat

No one gets on the site without basic safety equipment — hardhat, safety glasses, a high visibility vest, work boots and gloves. The driver of the tour bus taking the journalists to the site points out emergency exit windows. He brandishes a small hammer to smash a window if necessary. The bus doesn’t move until each passenger clicks in their seatbelt.

Victor Kenny, LNG Canada general manager

READ MORE: LNG Canada cost to exceed stated $40 billion price tag

Those processing modules being built in Asia are to be 70 metres long, 35 metres wide and 50 metres tall, the approximate height of a 13-storey commercial building.

They’ll be shipped to Kitimat in modular segments and assembled on-site, being transported to their final resting place via an elaborate series of interconnected trailers with hundreds of wheels controlled by a single operator using a remote control.

So sophisticated is the transport system that the operator is able to place the modules within centimetres of where they need to be located.

The sheer height of the modules has meant raising Rio Tinto BC Works’ power lines that cross the site to deliver power to the smelter from Kemano, so that the modules can fit comfortably underneath when being moved.

One of the more visible above-ground projects now underway is that of the worker camp, Cedar Valley Lodge, which is being built by the ATCO-Bird joint venture, for another joint venture between Fluor Corporation and JGC, the overall general contractor on the project.

There’ll be two living unit sections with a series of common buildings in the middle.

One of the modular accommodation sections is now being assembled with a finishing schedule of next spring to meet a first goal of 1,500 “heads in beds” with 1,000 more beds to be added each quarter thereafter to the final total of 4,500.

Unlike camps of past, each worker will have his or her own bathroom and each room will have its own TV. There will be sound dampening and other acoustic methods so that sleeping quarters will be as quiet as possible. The living areas will be co-ed.

The middle buildings will contain administration offices, sports and recreation facilities including male and female gyms, kitchen and dining facilities, an entertainment centre, a licensed lounge, a medical clinic, storage for luggage and housekeeping and maintenance facilities.

There’ll be landscaping around the area and informational material describes the facility as having the “largest core footprint” of its kind in Canada.

“You want your workers to come here and then want to come back,” said LNG Canada spokesperson Susannah Pierce of the atmosphere and amenities of the facility.

More than 4,500 people will be onsite at any one time at the peak of construction, requiring between 7,000 to 7,500 people in all given the shift work nature of the project. Workers will be onsite for 14 days at a time, returning after a seven-day break.

With accommodation facilities now underway, there’s other activity on the waterfront at two terminal sites.

LNG Canada is building Rio Tinto a new wharf in exchange for taking over the aluminum smelting company’s existing wharf. Dredging is now going on as part of that project.

kitimatLNGlng canada

Get local stories you won't find anywhere else right to your inbox.
Sign up here

 

LNG Canada project site manager Trevor Feduniak arrived in Kitimat in mid-2016. (Natalia Balcerzak/Terrace Standard)

LNG Canada’s ‘fish ladder’ at Anderson Creek, which allows fish to migrate despite construction-related work. (Natalia Balcerzak/Terrace Standard)

The middle buildings will contain administration offices, sports and recreation facilities including male and female gyms, kitchen and dining facilities, and other features. (Natalia Balcerzak/Terrace Standard)

Just Posted

Nathan Cullen, right, looks on as Wet’suwet’en hereditary leader Chief Woos, also known as Frank Alec, Minister of Crown-Indigenous Relation, Carolyn Bennett and B.C. Indigenous Relations Minister Scott Fraser address the media in Smithers, B.C., Sunday, March 1, 2020. THE CANADIAN PRESS/Jonathan Hayward
10 Gitxsan hereditary chiefs call for BC NDP to remove Cullen as Stikine candidate

Ten Gitxsan hereditary chiefs have called for the firing of NDP candidate… Continue reading

FILE - Nathan Cullen speaks to media in Smithers, B.C., Friday, February 28, 2020. THE CANADIAN PRESS/Jonathan Hayward
Horgan, Cullen apologize for Stikine candidate’s comments about Haida candidate

Nathan Cullen had made insensitive comments about Roy Jones Jr. Cheexial

Joe Bramsleven and partner Tammy Wilson (centre) await election results with campaign manager Scott Groves, right, and his wife Lori Ann Groves at Boston Pizza Oct. 15. (Deb Meissner photo)
Atrill defeats Bramsleven for mayor in landslide

Mika Meyer replaces Atrill as the sixth councillor

Stikine provincial election candidates (clockwise from top left): Nathan Cullen, NDP; Darcy Repen, Rural BC Party; Rod Taylor, Christian Heritage; and Gordon Sebastian, BC Liberals.
‘Where is Annita McPhee?’: Cullen under fire from opening salvo of all-candidates forum

Four Stikine candidates spar during online debate from Prestige Hudson Bay Lodge in Smithers

Screen capture from vintage 1955 Fall Fair Parade footage showing the Bulkley Hotel float.
VIDEO: Vernon videographer digs up rare footage of Smithers in 1955

The 8mm reel included an incredible two minutes of the 1955 Fall Fair parade on Main Street

With local MLA Adam Olsen looking on, BC Greens leader Sonia Furstenau said a Green government would convert BC Ferries into a Crown corporation Wolf Depner/News Staff)
Green leader Sonia Furstenau promises to convert BC Ferries back into Crown corporation

Promise comes Monday afternoon with five days left in campaign

A passer-by walks past a COVID-19 testing clinic in Montreal, Friday, Oct. 16, 2020. THE CANADIAN PRESS/Ryan Remiorz
Canada ‘yet to see’ deaths due to recent COVID surge as cases hit 200,000

Much of the increase in case numbers can be attributed to Ontario and Quebec

Is it time to start thinking about greener ways to package cannabis?

Packaging suppliers are still figuring eco-friendly and affordable packaging options that fit the mandates of Cannabis Regulations

Police confirm human remains were found in a recycling bin in Vancouver on Oct. 18, 2020. (Black Press Media file photo)
Human remains found in recycling bin floating near Vancouver beach

Police asking nearby residents to see if their recycling bin has gone missing

Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

B.C. Liberal leader Andrew Wilkinson visits a North Vancouver daycare to announce his party’s election promises for child care, Oct. 9, 2020. (B.C. Liberal Party video)
B.C. parties pitch costly child care programs in pandemic

B.C. Liberals say they’ll deliver on NDP’s $10-a-day promise for lower-income families

A B.C. man decided to create a website to help people find family doctors accepting patients. Because Victoria is considered high-demand, clinic openings can’t be posted publicly. (Unsplash)
Vancouver Island man starts website that connects B.C. residents with doctors

Nanaimo man started project to help people find family physicians accepting patients

Voting station at Tzeachten Hall in the riding of Chilliwack-Kent on the first day of advance voting in the provincial election on Oct. 15, 2020. (Paul Henderson/ Chilliwack Progress)
B.C. VOTES 2020: 380,000 British Columbians head to polls in first 4 days of advance voting

Some of highest voter turnout so far has been seen on Vancouver Island and in Shuswap

Most Read