Premier Christy Clark and BC Hydro CEO Jessica McDonald at announcement to proceed with Site C dam on the Peace River, 2015. (BC GOVERNMENT)

$1.75 billion spent on Site C so far

BC Hydro details risks of delay with $60 million a month being spent

The Site C dam project in northeastern B.C. has spent $1.75 billion as of the end of May and is currently spending $60 million a month, BC Hydro CEO Jessica McDonald says.

McDonald and other BC Hydro executives briefed reporters Wednesday on the project, after an exchange of letters Tuesday between Premier Christy Clark, NDP leader John Horgan and B.C. Green Party leader Andrew Weaver.

McDonald provided details on Clark’s estimate that a delay in relocating two houses on the site on the Peace River near Fort St. John would create a “domino effect,” delaying construction of a realigned road and bridge that would lead to a one-year delay in diverting the Peace River to begin work on the dam foundation in the riverbed.

BC Hydro estimates show that delay would add $630 million to the cost of the project, including storage of turbines and generators, an additional year of site and environmental maintenance, and shutting down and restarting the main civil works contract.

McDonald said there is $4 billion spent or committed in existing contracts for the third dam on the Peace River, a system that already supplies a third of B.C.’s hydroelectric power. She would not comment on eventual costs of cancelling the project.

Horgan wants the Site C dam put to a review by the B.C. Utilities Commission. He said during the election campaign that does not mean stopping the project while the review goes ahead. After the minority government result and Weaver’s decision to support an NDP government, Horgan wrote to BC Hydro asking it to stop issuing new contracts and extend the lease on two houses set to be moved.

Weaver campaigned to have the project stopped. He attended the briefing at a Victoria hotel Wednesday, and said afterward the $4 billion cost estimate is a “gross exaggeration” based on the assumption all contracts would be paid out in full.

McDonald wouldn’t comment on the scenario of cancelling the $8 billion project, which she said is a political decision. Her presentation detailed the fallout from delaying the relocation of two houses for realignment of Highway 29 along the Peace River, a project about to be tendered by the B.C. transportation ministry.

The house properties have been expropriated and if they are not moved to make room for the two-year road and bridge construction, that would trigger a one-year delay in the river diversion needed to build the dam foundation in the main channel of the river.

BC Election 2017BC Hydro

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Pretivm Resources reports fatality at Brucejack mine

The isolated incident occurred last Friday, and the employee passed away on Sunday in hospital

Smithers man leaves $1 million to children’s hospital

Jim Bolster wanted to help out children with health problems like his own

QUIZ: How much do you know about British Columbia?

On this B.C. Day long weekend, put your knowledge of our province to the test

New ownership resurrects BV Taxi

The new owners expect to be taking fares by mid-August

Tahltan Nation closes hunting and recreational activity access points

The remote and vulnerable territory has limited medical capacity

B.C. records 146 new COVID-19 cases through long weekend

More that 28 people tested positive for the virus each day since Friday

Canucks tame Minnesota Wild 4-3 to even NHL qualifying series

J.T. Miller leads Vancouver with goal and an assist

COVID-19 vaccine efforts provide hope but no silver bullet to stop pandemic: Tam

There are more than two dozen vaccines for COVID-19 in clinical trials around the world

Two people die in propane heated outdoor shower near Princeton

Couple was attending a long weekend gathering

Study shines light on what makes LGBTQ+ youth feel safe in a community

The study goes beyond looking at school or family supports

Alberta to require masks at schools this fall, but still no mandate in B.C.

B.C. students are also set to return to classrooms in September

B.C. to allow customers to buy cannabis online for in-store pickup at private shops

Age verification will still be required inside the store

30% of British Columbians would ‘wait and see’ before taking COVID vaccine: poll

Some are concerned about side effects, while others don’t think the virus is a big deal

Don’t leave your hand sanitizer in the sun and other tips to stay COVID safe this summer

Being mindful of staying outside and keeping hand sanitizer, sunscreen out of the sun recommended

Most Read